Monday, March 23, 2020

New Well!

After the well is drilled then the tank structure is built






everything is loaded up

Unloaded supplies are laid out.
Legs are welded on
with bracing
and supports
Flip it over and cement it into pre-dug holes
The solar hinge and solar frame are welded on

first attempt to lift will the panels on (too heavy)

Solar frame up


Adding the panels that will power the pump

pump installed in the well

first test of water


Young camels enjoying the water



unfortunately the pump dies after 1 hour








after the pump replacement and setting the tank once again the pump runs only an hour and dies.  The pump company promises a replacement