| After the well is drilled then the tank structure is built |
| everything is loaded up |
| Unloaded supplies are laid out. |
| Legs are welded on |
| with bracing |
| and supports |
| Flip it over and cement it into pre-dug holes |
| The solar hinge and solar frame are welded on |
| first attempt to lift will the panels on (too heavy) |
| Solar frame up |
| Adding the panels that will power the pump |
| pump installed in the well |
| first test of water |
| Young camels enjoying the water |
| unfortunately the pump dies after 1 hour |
| after the pump replacement and setting the tank once again the pump runs only an hour and dies. The pump company promises a replacement |
No comments:
Post a Comment